We have just completed this 3 level temporary propping scheme in the heart of London. The scheme included 55 ton of perimeter walers, CHS props and knee braces and two large pre-fabricated trusses which all had to be brought to site in sequence to deal with the constraints of a small and busy London construction site.
PROJECT VALUE: £250,000+