This website uses cookies which are essential for it to function. Please accept or decline any non-essential cookies and see our Site Terms for full details and guidance.

London Underground

Various

Working on four different sits across London we have been working in conjunction with our client to deliver galvanised steel frames to support mechanical fans and equipment in each shaft. The main site, City Road, also included a structural steel head house to host a heat exchange system to be used to recycle the hot air generated by the Underground into heating for the surrounding flats. This frame posed a unique challenge of producing heavy scale engineering on an 8x8 metre steel frame weighing over 80 ton, in one of our smallest sites to date.

PROJECT VALUE: £530,000+

Related Case Studies

Royal Albert Hall, London

Kensington, London

11-12 Dover Street

Mayfair, London