Royal Albert Hall, London

Kensington, London

Lomas worked in conjunction with Realtime Civil Engineering to complete a temporary basement propping scheme to this iconic London landmark. Spread over three levels, we were contracted to supply and install 85 tons of perimeter whalers and CHS props to our clients design. In addition to the main temporary work scheme we also completed clutch welding as required to the sheet pile wall. Phase two was completed in 2017.

PROJECT VALUE: £200,000
 