We have recently completed a five storey extension to a commercial property within 5 minutes of London Bridge Station. The structural steel frame was specifically designed to meet the challenges of a small site within London. This specific design enabled us to deliver the completed 40 ton frame without the use of heavy machinery on time and under budget. Completed in September 2017.
PROJECT VALUE: £165,000