We have completed our design, supply and installation of a new structural steel framed building to replace an existing structure in the heart of London. Our work included an 80 ton temporary facade retention and internal propping scheme over four floors, to enable the demolition of the existing building. This was then followed by the supply and installation of a new 200 ton steel frame completed in 2018.
PROJECT VALUE: £700,000